Rice Unconventional Wisdom

Construction at RicePersonnel Login
MediaProject TeamHome
 
Loading...
South Plant
South of Wiess College at Entrance Four
Project Manager: Erik Knezevich

The South Plant, a 14,200 square-foot building with over 1,100 feet of tunnel, supports the growth of Rice University by providing additional utility capacity. The South Plant powers the ten-story BioScience Research Collaborative at University and Main. The plant features many sustainable attributes including condensate harvesting, a green roof and photovoltaic arrays. The plant is located south of Wiess College at Entrance 4.

 

Construction Notices

RSS Feed
Crosswalk painting scheduled11/16/2009

The crosswalks near Baker and Herring Halls is scheduled to be painted on Tuesday

Temporary sidewalk near Lovett Hall11/11/2009

A temporary sidewalk is scheduled to be installed near Lovett and Herzstein Halls this week 

West Lot asphalt repairs11/2/2009

West Lot asphalt repairs are scheduled to begin on Saturday, Nov. 7 through Nov. 9

Additional sidewalk closure near Baker College10/27/2009

The sidewalk just north of Baker College near the Humanities Building will be closed on Nov. 3

Paver repair work at RMC10/9/2009

Repair work scheduled for the Ley Plaza at the Rice Memorial Center on Sunday, Oct. 18

Asphalt repairs for Stadium Lot

Roadway repairs to the Stadium Lot are scheduled to begin on Tuesday, Oct. 13.

Alumni Drive repairs scheduled

Road repair scheduled to begin on Friday, Oct. 9. and finish at the end of Mid-term Recess

Sidewalk repairs10/2/2009

Several sidewalk repairs around campus will commence Wednesday October 7.

In the News

People Spotlights

Loading...

The Construction Information Center at Rice University is located at the corner of College Way and Alumni Drive.

Monday-Friday, 9 a.m.-5 p.m.
713-348-3793
construction@rice.edu

In case of emergency, contact:
The Facilities Service Center
713-348-2485

After hours, contact:
The Central Plant Control Room
713-348-4095