Soil boring work near Wiess College
A drilling rig is scheduled to be onsite near Wiess College on Tuesday, May 12 to take several soil boring samples. The rig will enter campus using Entrance 4 and will drill two (2) 4” diameter x 25’ deep holes beginning at 8:00 am. Work will be complete by 2:00 pm. The holes will be temporarily covered and coned off for the evening. The crew will return to on Wednesday, May 13 to check for water in the borings and then fill the holes permanently. The area will be restored to its existing condition by the end of business on May 13.
If you have specific questions about this scheduled activity, please contact Tina Hicks (x4296 or tinah@rice.edu).