Reconstruction of John Freeman Boulevard
The reconstruction of John Freeman Blvd. between Fannin St. and E. Cullen St. will begin Mar. 12 and is scheduled through Dec. 31. The reconstruction includes utility work along with new pavement and sidewalks. The project will be phased to maintain access for driveways and two-way traffic. METRO will be moving the bus stops on John Freeman to the corners of John Freeman Boulevard and E. Cullen Street. METRO will provide signage to direct riders to those locations.
The contractor will install traffic control devices, equipment, and signage. Police officers will be on duty to direct traffic and help pedestrians.
For further information or assistance, please contact Texas Medical Center Security (713)795-0000