Rice Unconventional Wisdom

Construction at RicePersonnel Login
Loading...

The construction trailers for the Brockman Hall for Physics are scheduled to arrive today, Thursday, Feb. 19.  before noon. The trailers will be brought down Campanile Drive and will be placed in the turnaround loop between the Mudd Building and Hamman Hall. Flag persons will be present to direct or stop traffic in that area if necessary. Expect for traffic to be slow or stopped in that area during that time. Contact Erik Knezevich (x6369) if you have specific questions about this scheduled event.

 

Loading...

The Construction Information Center at Rice University is located at the corner of College Way and Alumni Drive.

Monday-Friday, 9 a.m.-5 p.m.
713-348-3793
construction@rice.edu

In case of emergency, contact:
The Facilities Service Center
713-348-2485

After hours, contact:
The Central Plant Control Room
713-348-4095